|
19-21 September 2012
Almaty, Kazakhstan
IEC "Atakent"
|
|
|
|
Navigation
|
![]() |
Stand:
B-121
Company: ЕNGINЕЕRING DОBЕRSЕK GMBH
Address: Раstоrеnkаmр 31, D-41169 M?nсhеnglаdbасh
Country: Gеrmаny
Tel: + 49 (0)2161 901080
Fax: + 49 (0)2161 9010820
EMail: info@ed-mg.de
ENGINEERING DOBERSEK GmbH is the leading expert for planning, construction and commissioning of your process plant. Mining/Metallurgy: reconstruction and optimization of treatment plants in the fields of iron and non-ferrous metals, coal, complete mine dewatering systems, mine desludge systems, Conticlass®System for optimization of particle size distribution after grinding, GrindExpert® for optimization of the complete grinding process, mine refilling system. Power Engineering: Flue gas desulphurization plants, gypsum dehydration plants, complete turnkey steam generation, electrostatic filter plants for flue ashes, transport systems of electrostatic filter ashes, silo facilities for flue ashes. Water Treatment: process- and drinking water treatment, municipal wastewater treatment, mobile treatment plants. Special Installations: industrial cooling plants, transformer oil purification plants, thickener plants, optimization of long-distance energy networks, pumping stations for slurry, foam and high-pressure water, рlants for further processing of aggressive media, oxygen and air compression stations.
|
Technical Support
MiningWorld Russia 2012 shows 70% growth
May 1, 2012
Iteca and Expo.kz join forces
Feb 27, 2012
33% growth at MiningWorld Central Asia 2011
Oct 26, 2011
|